Guide
What to check before you sign
You are not really buying shingles. You are buying four days of somebody else's workmanship, and hoping the company still exists when you need the warranty.
Or call (951) 576-6159Get it looked at
Three questions, and up to three Jurupa Valley contractors. Free either way.
Your request is in.
We are matching it now against roofing contractors working in Jurupa Valley and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
Prefer somebody you could drive to
Ask where their yard is. Companies that follow storms across state lines do competent work and then vanish, which is fine right up until something needs putting right.
Be careful with the deposit
Ten to thirty per cent is normal, often to order material. Full payment before work starts is not, and in several states it is not even legal. Hold the final payment until you have walked the job.
Get everything in writing, including the unknowns
The contract should say the material and the layers, who pulls the permit, the per-sheet price for replacing bad decking, what happens to the old material, the payment schedule, and the workmanship warranty. The decking clause is the one people forget and the one that moves the price.
Ask for current certificates of insurance
Insurance certificates expire. A certificate dated eight months ago tells you what was true eight months ago. Ask for one issued this month.
Compare scope, not totals
Lay the quotes side by side line by line. Underlayment type, ice-and-water coverage, drip edge, valley treatment, ventilation, flashing replacement, decking allowance and warranty. Large gaps in the total are almost always gaps in the scope.
Check the licence yourself
A licence number on a business card is not a licence. Look it up, confirm the name on the licence matches the name on the contract, and check the status is active today.
In short
Three quotes, three licence checks, three certificates of insurance. It is a dull hour that routinely saves five figures.
Related questions
Do I have to hire anyone?
Not at all. Plenty of people use this to find out what a job costs and then do nothing for a year. That is a perfectly reasonable outcome.
Can I just put a new roof over the old one?
Often you legally can, and it is usually a poor idea. Overlaying hides the condition of the decking, adds weight, shortens the life of the new shingles by trapping heat, and doubles the cost of the next tear-off.
Why does ventilation keep coming up?
It is the most under-sold part of a roof. Trapped heat and moisture shorten shingle life, warp decking, and in cold weather it is what turns snow into an ice dam.
Get it priced
Three questions, about a minute, and up to three Jurupa Valley contractors come back to you.